LNG Pumps LNG Regasfication System LNG Dewar Filling Pump Skid

LNG Pumps LNG Regasfication System LNG Dewar Filling Pump Skid

LNG Pumps LNG Regasfication System LNG Dewar Filling Pump Skid cryogenic liquid oxygen nitrogen argon co2 lng pump works
Basic Info
Model NO. SMC-600-900/200
Specification SMC-1500L/H
Trademark SMC
Origin China
HS Code 8413810090
Production Capacity 20set Per Year
Product Description
LNG Pumps LNG Regasfication System LNG Dewar Filling Pump Skid

LNG Pumps LNG Regasfication System LNG Dewar Filling Pump Skid

cryogenic liquid oxygen nitrogen argon co2 lng pump workshopLNG LCNG Refueling Station: 25Mpa LNG Transer Pump Skid
One. Introduction1.1The medium used in this process system:Liquefied Natural Gas(LNG) Design Temperature:-196ºC Working Pressure: before submersible pump ≤1.6MPa, after pump≤2.0MPa; L-CNG high pressure pump before≤1.6MPa, after pump≤25MPa;

LNG Pumps LNG Regasfication System LNG Dewar Filling Pump Skid


1.2 Physical Parameters of LNG:Average Molecular Weight:17.3Main Components:methane(CH4)~ 93.6 %,Ethane(C2H6)~4.12 %Vaporization Temperature: -162.3ºC(atmospheric pressure)Liquid Density:~426 kg/m3 Gas Density:0.772 kg/Nm3 (15.5 ºC) Gas/Liquid Volume Ratio:~625:1(15.5 ºC)Ignition Point:650 ºCRemarks:As the LNG varies from place to place, the physical property parameters must be based on the LNG supplier's.

LNG Pumps LNG Regasfication System LNG Dewar Filling Pump Skid


Two.LNG/L-CNG Filling Station Process Flowchart
  1. Unloading Process: Transfer LNG(liquid natural gas) from the tank truck to the LNG storage tank of the gas station through the LNG submersible pump skid(including the unloading truck and the tank booster) at the gas filling station.
  2. Pressurization Process: After unloading, the LNG is pressurized to above 23Mpa by the LNG high pressure pump skid, and then gasified into CNG(high pressure natural gas)by the high pressure vaporizer skid(including high pressure vaporizer, high pressure water bath electric heating reheater, and sequence control panel), and enter the high pressure gas cylinder group for storage.
  3. Gas Filling Process: When the pressure in the high pressure gas cylinder group is too low to be able to refill normally, the high pressure pump restarts and vaporizes to replenish and pressurize the high pressure gas cylinder group, and refill the car.
  4. Liquid Filling Process: LNG is pressurized to about 1.6Mpa by the LNG submersible pump skid, and LNG is filled into the car bottle group through the pipeline and LNG dispenser.
Three.The General Process Flow Chart is as follows:

LNG Pumps LNG Regasfication System LNG Dewar Filling Pump Skid

LNG/L-CNG Refuel Gas Station Equipment: L-CNG High Pressure Vaporizer Skid

LNG Pumps LNG Regasfication System LNG Dewar Filling Pump Skid

LNG/L-CNG Refuel Gas Station Equipment: LNG Submerged Pump Skid LNG/L-CNG Refuel Gas Station Control System LNG Dispenser Technical Specification
ItemSpecification
Flow Range3-80kg/min
Max Working Pressure1.6MPa
Working Temperature-30-+55ºC
Inlet Flow Meter Type1" low temp mass flow meter E+H/Emerson
Measurement Accuracy±1%
Minimum Reading Graduation Value0.01kg or Nm3,L
Single Measurement Range0-9999.99kg(or Nm3,L)
Cumulative Measurement Range0-99999999.99kg(or Nm3,L)
Filling Hose1" stainless steel soft pipe 4m
Return Air Hose1/2" stainless steel soft pipe 4m
Networking InterfaceRS485(use photoelectric isolation 8KV ESD)
Electrostatic Discharge Immunity4class 8KV
Electrical Fast Transient Pulse Group Immunity4 class 4KV
Surge Immunity4 class 4KV
Power SupplyAC220V<200W
Explosion-proof GradeExdibellBT 4Gb
WeightAbout 325kg
LNG LCNG Refueling Station Equipment: LNG Dispenser
LNG/L-CNG Refuel Gas Station Testing:
Welcome all the foreign customers come to visit our factory and LNG/L-CNG Gas Refueling Station Working Site.Thanks.